INTERZINC 315 PDF

August 1, 2019 posted by

Interzinc B. Storage Conditions: All painting materials shall be stored in a clean, dry, well ventilated place, protected from sparks, flame. A three component, metallic, zinc rich epoxy primer which passes Slip B coefficient. Interzinc B complies with SSPC Paint 20 and contains minimum 80%. Interzinc Call for Price. A two component high solids, low VOC metallic zinc- rich epoxy primer formulated on proprietary polymer technology which provides.

Author: Meztit Kahn
Country: Martinique
Language: English (Spanish)
Genre: Video
Published (Last): 15 June 2007
Pages: 111
PDF File Size: 9.71 Mb
ePub File Size: 8.17 Mb
ISBN: 821-1-71674-870-9
Downloads: 15781
Price: Free* [*Free Regsitration Required]
Uploader: Nezshura

Areas will be designated by the Architect. Do not apply coatings under environmental conditions outside manufacturer’s absolute limits. Submit product data including manufacturer’s technical information indicating product performance characteristics, performance and limitation criteria.

Interior environments with permanent condensation and pollution. Before proceeding with the work, the applicator will apply the primer and finish intetzinc to a representative substrate section of square feet in size. International Paint, LLC, which is located at: Low Atmosphere or Interior Applications – Rural area, low pollution, dry environments. Pipes, ducts, conduits, hangers and supports, equipment, and equipment enclosures exposed to view in all rooms and spaces except mechanical rooms, electrical rooms, and utility rooms.

Store and dispose of hazardous materials, and materials contaminated by hazardous materials, in accordance with requirements of local authorities having jurisdiction.

Once agreed upon in writing it serves as a guide for the finished work.

SECTION HIGH PERFORMANCE SPECIALTY COATINGS

Wood, plaster, concrete, concrete masonry walls, ceilings, soffits, walkways, curbs, steps. Provide primer cut back areas a minimum three 3 inches 76mm from bolted connections and minimum twelve 12 inches mm from welded connections. Equipment and application procedures must conform to the coating manufacturer’s application instructions.

Provide intwrzinc, drop cloths or other suitable coverings to prevent overspray onto surfaces not intended to be affected by Work in this section. Maintain environmental conditions temperature, humidity, and ventilation within limits recommended by manufacturer for optimum results. Pipes, ducts, conduits, hangers and supports, equipment, and equipment enclosures exposed to weather or view – corrosion-resistant finish.

  BBSA BMC PDF

Submit manufacturer’s written installation instructions. When deciding on the extent of the mock-up, consider all interzijc major different types of work on the project.

All batch number, product identification and quantities shall be recorded on appropriate QC documents. Structural steel and framing with reference to primer receiving fire protection materials. If necessary for job schedule, inerzinc General Contractor shall provide enclosures and heat to maintain proper temperatures and humidity levels in the application interzzinc. Upon completion of installation, all excess material, overspray and debris must be cleared and removed from the job site.

The Manufacturer’s quality management system must be assessed and registered by an independent registrar as conforming to the requirements of ISO Submit applicators current certification as a manufacturer trained and approved applicator. No coating material may be procured or delivered to the project site prior to the review and acceptance of the proposed materials by the Architect in writing.

Do not proceed with remaining work until workmanship, color, and sheen are approved by Architect.

Interzinc 315

To be selected by Architect from manufacturer’s full range of available colors. Substrate and air temperature shall be in accordance with the manufacturers requirements. Verify that substrate and workspace temperature and humidity conditions are in accordance with requirements of this section. Temporary protection and heat shall be maintained at this minimum ibterzinc for 24 hours before, during and 24 hours intezrinc material application. Apply material at the required dry film thickness.

Marine, offshore and coastal areas with high salinity. Steel substrate temperature shall be a minimum of 5 deg F 3 deg C above the dew point of the surrounding air for a period of 24 hours prior and during the application of the material.

Regional Materials- 20 percent extracted, processed and manufactured regionally: Deliver materials in manufacturer’s original, sealed, undamaged container with identification label intact. Store materials in strict accordance with manufacturers documented instructions. Final color, gloss and finish will be determined and approved by the Architect. Commencement of application is acceptance of substrate.

  ELECTRICITY AND MAGNETISM DUFFIN PDF

This section is based on the products of International Protective Coatings, which is located at:. Do not commence application interzinx coatings until the contractor, applicator and inspector have examined the surfaces to receive Work in this section, and determined that the surfaces are acceptable to receive the specified materials.

International Paint has operations in 54 countries worldwide and over 3, employees. Provide a mock-up for evaluation of surface preparation techniques and application workmanship.

Requests for substitutions must be made 30 days prior to submittal and contain the full name of each product, descriptive literature, testing data collected from industry consensus standard testing, data on past performance, manufacturer’s instruction for use and generic type. Sequence and coordinate application of coatings with Work in other sections which would interfere with efficient protective coating application. Information must demonstrate equivalence of product and performance to the specified material and complete interzzinc.

Interior environment with high humidity and exposure to air pollution. Retain only coating systems specified and delete all others. All surfaces to receive coatings must be clean, dry and free of oil, grease, loose mill scale, dirt, dust or other foreign substances which would impair bond of the material to the substrate. Protect adjacent areas from over spray of coating material. Primer applied off site interzicn be in accordance with the provisions of Section At project closeout, provide to Owner or Owners Representative an executed copy of the manufacturer’s standard limited warranty against manufacturing defect, outlining its terms, conditions, and exclusions from coverage.